ITC BL4

The ITC BL4 is used to rapidly excavate bottom ballast on S&C and plain line renewal projects.

ITC

The ITC BL4 inline conveyor system allows the material to be fed through the main body onto the rear conveyor system. This rear conveyor is capable of feeding material into wagons on an adjacent line or an MFS+ directly behind.

When combined with our MFS+ On Track machines and MFS wagons it can facilitate single-bore tunnel and single line excavations with the future potential to be utilised for any Line Open operations.

The ITC BL4 eliminates the traditional renewal requirements for a spoil wagon train on the adjacent line and multiple On Track Plant within the excavation, although it can work highly efficient whether in-line or adjacent line working.

The ITC BL4  excavates at up to 150m3 per hour and can be controlled in a 2D or 3D environment using its fully integrated smart GPS antenna.