Design and build of the plain line track system
Client: | Stobart Rail |
Location: | London, UK |
Construction period: | 2016 |
Executing companies: |
Rhomberg Sersa UK |
Contract value: |
£4.5 million |
GRIP 3-8 (Design and build) of the plain line track system, consisting of circa 2800m (1400m twin track) of slab track PORR STA, 400m (200m twin track) of traditional ballast system, including 12 No V-TRAS slab to ballast transitions to replace the existing traditional ballast track system, providing higher fixity and increased clearances for electrification.
We undertook the 3D survey, optioneering, outline and detailed design of the track system and the construction included the full track system installation including formation treatment and RC Slab. Included in the design and build was a bespoke slab track system to interface and protect a Thames Water sewer system.